| Item No. | Description | Amount of charges in Rs. |
|---|---|---|
| 1(a) (b) |
Meter inspection and testing if the correctness of a meter belonging to the Department is challenged by the consumer (single phase) Meter inspection and testing, if the correctness of a meter belonging to the department is challenged by the consumer : i) polyphase-whole current i.e. without C.T. ii) L.T. meters with C.T.'s iii) HT & EHT metering equipment Note: If the challenged meter is found to be incorrect, credit of these charges will be given to the consumer, otherwise these will be forfeited |
Rs.120 Per energy meter Rs.450 Per energy meter Rs.1200 Per energy meter Rs.2400 Per energy meter |
| 2. | Meter changing at the request of the consumer or changing the position of the meter in the same premises when no additional material is required i) Single phase ii) Polyphase whole current meter, i.e. without C.T. iii) L.T. meter without C.T.S. iv) H.T. & EHT metering equipment |
Rs.225 Per energy meter Rs.450 Per energy meter Rs.900 Per energy meter Rs.2400 Per energy meter |
| 3. | Re-sealing charges irrespective of the number of seals involved against each item below and where seals found to have been broken by the consumer-
|
Rs.50 Rs.50 Rs.150 Rs.375 Rs.900 Rs.900 |
| Note: If M&T or ME seals are found to be broken/tempered cost of meter shall be recoverable and the case shall be treated as theft case | ||
| 4. | Meter Rentals
|
Rs. 11 per month Rs. 25 per month Rs. 57 per month Rs. 42 per month 1.6 paise per rupee of the cost of metering equipment Rs. 320 per month |
| 5. | Reconnection: Reconnection/Connection the premises of any consumer who was previously disconnected on account of breach by him of the conditions of the supply or of his agreement with the Department or of such provisions of the Act as may be relevant whether the premises to be reconnected/connected are the same or not.
|
Rs.120 Rs.150 Rs.250 |
| 6. | Reconnecting vacated premises on the request of the consumer in case the service line is existing:
|
Rs.120 Rs.150(Three Phase LT) Rs.250(Three Phase HT) |
| 7. | Service Charges(including Fuse Replacement etc. per month):
|
Domestic Non-Residential Supply Rs.5.00 Rs.5.00 Rs.10.00 Rs.25.00 Rs.20.00 Rs.45.00 Rs.20.00 Rs.75.00 Rs.150 Rs.450 |
| 8. | TESTING CONSUMER'S INSTALLATION
|
Nil Rs.150 payable in advance for each subsequent visit for the purpose of testing the installation Rs.200.00(Three Phase) Rs.300.00 Rs.500.00 |
| 9. | Replacement of Meter card found to be missing on consumer's premises:
Replacement of Identification card missing on the premises of the AP consumer |
Rs.45.00 Rs.25.00 Rs.10.00 Rs.5.00 Rs.60.00 Rs.25.00 |
| 10.(a) (b) (c) |
Replacement of the broken glass of a cupboard (When the cause of the breakage is considered to be an act of default of the consumer) Replacement of broken glass of a single-phase meter Replacement of broken glass of three phase meter |
Rs.30.00 Rs.250.00 Rs.450.00 |
| 11. | Supply of duplicate copy of energy bill
|
Rs.3.00 Rs.10.00 Rs.10.00 Rs.20.00 |
| 12. | Review of Energy Bills: If the accuracy of a bill is challenged by the consumer and a review of the bill is demanded-
|
Rs.10.00 Rs.250.00 Rs.450 Rs.900 |
| Note- If the bill is found to be incorrect credit of the fees will be given to the consumer, otherwise it will be forfeited | ||
| 13. | Meter installation charges: Whenever the meter purchased by the consumer, from either the department or the market, is installeld at the consumer's premises by the department:-
|
Rs.100.00 Per energy meter Rs.250 Per energy meter 2% of the cost of metering equipment subject to a minimum of Rs.900/- |
| 14. | Testing and Calibration including sealing of energy meter owned/supplied by the consumer
|
Rs.60.00 Rs.450.00 Rs.1200.00 Rs.2500.00 |
| 15. | Checking of the capacities at the request of the consumers. Consumers receiving supply at
|
Rs.150/unit Rs.300/unit |
Service conenction charges are provided in 'Schedule of General and Service connection Charges' are to be recovered from all prospective consumers and existing consumers seeking extension load. Schedule of service connection charges as per prevalent is given hereunder:-
| Fixed per KW charges (Single Phase) | Domestic | NRS |
|---|---|---|
| Upto 1KW Above 1KW and Upto 3KW Above 3KW and upto 5KW |
Rs.250.00 Rs.300.00 Rs.500.00 |
Rs.250.00 Rs.300.00 Rs.750.00 |
| Fixed per KW charges (Three Phase) | ||
| Above 5KW | Rs.750.00 | Rs.1000.00 |
No vairable charges are leviable upto 75 meter Rs.Beyond 75 meters for all loads various charges @ Rs.125/- per metre length of service line shall be recoverable for loads in excess of 5 KW.
Domestic and non-residential consumers falling under the following categories have the option either to pay in lumpsum the service connection charges as mentioned under the prededing clause or to pay monthly service rentals @ 1.6 paise per rupee of the estimated cost of service line excluding the cost of 30.48 metres.
|
Service connection Charge |
|
Rs.750/- per KW |
| ii Above 1 MW | Rs.750/- per KW or actual cost whichever is higher |
|
To be charged @ Rs.750/- per KW for extension part only. | |
|
||
|
Rs.750/- per KW (chargeable for extension part only) or actual cost, whichever is higher. | |
|
||
|
ELECTRICITY DEPARTMENT ||
ABOUT US ||
CONTACT US ||
NEW CONNECTION FORMALITIES ||
NEW CONNECTION APPLICATION ||
|